Article
Publication date: 15 June 2021

Fadi A. Fatayer, Amjad Z. Issa, Mohammed Abunemeh and Mohammed A.M. Dwikat

Construction contractors in Palestine, as in many other developing countries, suffer from many problems. One of their main problems is their inability to meet contractual…

Abstract

Purpose

Construction contractors in Palestine, as in many other developing countries, suffer from many problems. One of their main problems is their inability to meet contractual requirements, such as completing projects within time, at the agreed cost and to the desired quality. Therefore, this paper aims to investigate the causes of the non-fulfillment of contractual requirements in three different types of projects: building, road and electro-mechanical projects.

Design/methodology/approach

Two methods were adopted to collect the data – qualitative and quantitative. In total, 65 causes were identified from the literature and qualitative semi-structured interviews with professional experts. These causes were classified into five categories: managerial, financial, contractor capabilities, regulations and laws and political. In the quantitative approach, a questionnaire was developed and then distributed to 50 professional experts: 20 building experts, 15 road experts and 15 experts in electro-mechanical projects. A five-point Likert scale was used to assess the importance, from the perspective of the subject matter experts, of the causes that had been identified. About 35 responses, which represent a combined response rate of 70%, were received. The quantitative data were analyzed using descriptive statistics, with the mean, standard deviation and degree of importance for each of the identified causes being determined, and the SPSS software platform used to rank them.

Findings

The results reveal that the most important reasons why contractors did not fulfill their contractual requirements in building projects were that contracts were awarded to the contractor offering the lowest price, and the profit margin was low because of intense competition among contractors. In road projects, the most important causes were the poor estimation of the equipment required and a lack of standardized conditions in the construction sector, while in electro-mechanical projects, the most important causes were the inability of the contractor to estimate the cost of the project accurately because of unclear bid documents and a lack of contractor capital.

Originality/value

The results of this study will be useful to stakeholders and Palestinian contractor unions. They can be disseminated to give guidance so that contractors can avoid these problems in future construction projects and enhance their compliance with contractual requirements. Moreover, knowing about these causes may lead to the reduction of conflicts and disputes between contractual parties (owners and contractors), which in turn will be reflected in the work quality and reputation of contractors.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 March 2019

Fadi A. Fatayer, Mohammad A. Hassanain, Abdullatif Abdallah and Abdul-Mohsen Al-Hammad

The purpose of this paper is to investigate the current practices of the early facilities management (FM) involvement during the design development and review stages (DDRS), and…

Abstract

Purpose

The purpose of this paper is to investigate the current practices of the early facilities management (FM) involvement during the design development and review stages (DDRS), and recommend activities aimed at achieving better integration.

Design/methodology/approach

A comprehensive literature review was conducted to ascertain the challenges faced by the integrated design team (IDT) in the absence of the facilities managers’ review of design solutions, and underscore the significance of the early involvement of facilities managers during the DDRS. A questionnaire survey was then developed for collecting data on eight aspects of the current practices of early FM involvement during the DDRS. The questionnaire survey was administered to the FM departments of 13 long established, public universities in Saudi Arabia. Ten responses were obtained and analyzed.

Findings

The findings suggest that the early involvement of the FM department enhances the operation and maintenance of facilities. This has been measured through reductions in the number of architectural, structural, electrical, plumbing, heating, ventilating and air conditioning defects.

Practical implications

Recommendations were provided to facilitate the process of integrating the practices of two influential stakeholders of building projects. These recommendations encompass the need for maintainability considerations at the early schematic stage, the necessity of direct contact between the two parties and the necessity of facility managers’ increased familiarity of the design stage activities, among other recommendations. In this way, the study promotes the awareness of the significance of integrating FM with the IDT at the DDRS.

Originality/value

This study contributes to the literature and practice by presenting a detailed analysis of the integration process between the FM department and the IDT. Furthermore, the outcomes of the integration between the parties were measured to assess the effectiveness of the collaboration and highlight the possible areas of improvement.

Details

International Journal of Building Pathology and Adaptation, vol. 37 no. 5
Type: Research Article
ISSN: 2398-4708

Keywords